Here are new pictures of the B-unit. At the B-end the outlets of the two steam-generators are applied - the vanes & openings directed straight to the rear end.
The side-frames of the trucks are basically assembled - the (simulated) leaf- and coil-springs and the brake cylinders are still missing.
6/08/2013
4/09/2013
M-10005: anti-climber & buffer
The anti-climber has been detailed and the buffer (made from a massive rubber block) was adapted to it's receptacle for a test. The profile of the tip of the nose was slightly revised (straightened) on the lower half.
3/30/2013
M-10005: pilot's details
Application of raised chrome parts and hex-nuts to the pilot
The hex-nut row at the bottom of the pilot will not be applied - it interferes with the welded frame inside as well as it would weaken the pilot bottom.
The hex-nut row at the bottom of the pilot will not be applied - it interferes with the welded frame inside as well as it would weaken the pilot bottom.
3/24/2013
New pictures of assembled M-10005 A-unit
Finally a sunny day made it possible to assemble the A-unit outside and make a photo-session as well as some measurements with the unit on rails (the critical dimension is the distance of the pilot to the top of the rails).
And a detailed view of the compressed air cooler on the top of the unit
The future engineer also took the opportunity to pose with his workhorse (some older guys might recognize the old 'Big Jim'-action figure).
And a detailed view of the compressed air cooler on the top of the unit
The future engineer also took the opportunity to pose with his workhorse (some older guys might recognize the old 'Big Jim'-action figure).
3/23/2013
M-10005: pilot's construction
Another 'critical' & distinctive part has been basically finished - the pilot.
While the circumference shape changes from almost tangent (at the unit's side) with a decreasing radius into the tip of the item the vertical orientation is twisted from almost vertical (once again at the side) into a significant angle at the tip.
From a test-sample from wood and cardboard the basic shapes of ribs/frames at the upper and lower position were evaluated.
First a basic main frame from square tubes was constructed and test-fitted onto the unit's chassis.
Flat bar irons (thickness app. 1/10 of an inch) were welded and ground into the determined shape of the ribs. These were welded onto the basic main.
The pilot's panels were cut from a iron stove-pipe (8" diameter) and bent into the shape given by the ribs (with deliberate use of a hammer). The panels were welded to the ribs finally while fixed by heavy clamps.
Finally the pilot was cut & ground into the prototypical shape.
Some sanding was necessary to adapt the overlap of the shell to the new pilot - some re-laminating of the overlapping area will be necessary. But basically the pilot now fits the shell.
While the circumference shape changes from almost tangent (at the unit's side) with a decreasing radius into the tip of the item the vertical orientation is twisted from almost vertical (once again at the side) into a significant angle at the tip.
From a test-sample from wood and cardboard the basic shapes of ribs/frames at the upper and lower position were evaluated.
First a basic main frame from square tubes was constructed and test-fitted onto the unit's chassis.
Flat bar irons (thickness app. 1/10 of an inch) were welded and ground into the determined shape of the ribs. These were welded onto the basic main.
The pilot's panels were cut from a iron stove-pipe (8" diameter) and bent into the shape given by the ribs (with deliberate use of a hammer). The panels were welded to the ribs finally while fixed by heavy clamps.
Finally the pilot was cut & ground into the prototypical shape.
Some sanding was necessary to adapt the overlap of the shell to the new pilot - some re-laminating of the overlapping area will be necessary. But basically the pilot now fits the shell.
12/28/2012
M-10005: test-assembly
Some pictures of the a preliminary assembly of trucks, frame & shell (due to space restrictions this is much easier to be done outside):
side views
side views
and a better view of the exhaust manifold
12/17/2012
M-10005: updated front
Some pix of the current status of the nose-area:
A smaller headlight-tube was mounted - it starts with a circular cross-section and changes smoothly into an almost square cross-section close to the windows.
Additionally the raised section alongside the headlight 'tube' and between the grills was fabricated.
The window-frames as well as the door-frames were set into the shell - now the several portholes' frames are under construction
10/27/2012
10/15/2012
KM ML 4000CC - update
Photos taken during the US-convention in Adliswil/Switzerland last weekend
The trucks' side frames are still under construction - however, the main components of suspension & axle bearings are attached.
The trucks' side frames are still under construction - however, the main components of suspension & axle bearings are attached.
8/28/2012
M-10005: front grill
During the very tedious work on paint touch-ups on the KM caused by a 'catastrophe' during the attempt of using liquid tape as simulation of the rubber-gasket on the shell , I got some solace by working on the M-10005's front grills...it seems that they are close to the prototype and even (almost) symmetrically on left and right. Since the front end of the nose consists of compound curves in every direction, shaping the frame and the horizontal ribs was a trial-and error process.
Additionally the door frames and further grills on the side were attached.
Additionally the door frames and further grills on the side were attached.
8/13/2012
Update on KM's paint-job
Almost finished (some faults caused by over-spray have to be corrected).
Next step will be the rubber-decoupling around the cab - I intend to use liquid electrical tape for this
Next step will be the rubber-decoupling around the cab - I intend to use liquid electrical tape for this
8/09/2012
8/07/2012
M-10005's shell - update
The housing for the headlight (copper tube) was fitted into the nose as well as the housing for the vertical warning light on the cab.
Cut-outs for the exhaust-system were made in the roof; for the photo, the roughly shaped insert part (which will carry the exhaust-muffler like a tray) was placed provisionally.
Cut-outs for the exhaust-system were made in the roof; for the photo, the roughly shaped insert part (which will carry the exhaust-muffler like a tray) was placed provisionally.
7/16/2012
M-10005 - shell
Cut-out for windows and grill are roughly made....
And with the cut-out's for the front-grills...
And a look into the interior of the shell - the foam-'plug' was rather easy to remove with hot-cutter, chisel etc.
And with the cut-out's for the front-grills...
And a look into the interior of the shell - the foam-'plug' was rather easy to remove with hot-cutter, chisel etc.
7/09/2012