12/17/2012

M-10005: updated front

Some pix of the current status of the nose-area:
A smaller headlight-tube was mounted - it starts with a circular cross-section and changes smoothly into an almost square cross-section close to the windows.
Additionally the raised section alongside the headlight 'tube' and between the grills was fabricated.



 The countersunk manifold (16 inlets, 4 outlets) in the lowered area and inlet-grids alongside were fitted into the removable, central roof-section.


The window-frames as well as the door-frames were set into the shell - now the several portholes' frames are under construction



No comments:

Post a Comment

Note: Only a member of this blog may post a comment.